Six Core Facilities

At our 2,000 m² smart factory — backed by over KRW 6 billion in equipment investment — we run every stage
in-house, from AI-driven dismantling and precious-metal refining to data destruction. Full-scale operations begin in H2 2026.

Facility 01

AI Vision Robotic Arm
Auto-Dismantling Line

Precision disassembly by AI-vision SCARA robots ·
HDD permanent magnets · platters ·
PCB separation & recovery

1,000+ HDDs / day
Facility 02

Large-Capacity PCB Shredding & Sorting Line

20-80 kV electrostatic separation of non-ferrous metals. High-purity recovery of copper and aluminum.

1.6-2 t / hr
Facility 03

Cyanide-Free Eco
Precious-Metal Refining

No cyanide compounds used · Au · Ag · Pd high-purity recovery · Full environmental compliance.

99.99% purity
Facility 04

High-Voltage
Electrostatic Separator

20-80 kV electrostatic separation of
non-ferrous metals. High-purity recovery
of copper and aluminum.

Cu 99.9%
Facility 05

Military-Grade
Data Destruction System

Based on NIST 800-88 ·
Instant CoD issuance ·
Optional physical shredding.

1.6-2 t / hr
Facility 06

Integrated Environmental
Control System

Fully enclosed negative-pressure transfer ·
Zero-dust environment ·
Comprehensive worker safety design.

Zero Dust

Smart Eco-Mining Process Flow
Three Assets Generated Simultaneously

Retired ICT
Asset Intake

PC · Server
HDD
Network gear

AI
Integrated Processing

6-facility
One-Stop line

 

Security Asset
CoD issuance

 

Resource Asset
Au · Ag · Pd recovery

 

Carbon Asset
VRC issuance

Get Your Free Quote Today

Our team will get back to you within 24 hours

PARTNERSHIP
Back to top